Projects


EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:

 

 

Safety assessment Report for the project: “Upgrade of the Existing Double-Track Railway Line between SKA (Chainage 19+700) and the Exit of Oinoi Railway Station (Ch. 71+400), Reconstruction of Agios Stefanos Tunnel

Safety assessment Report for the project: “Upgrade of the Existing Double-Track Railway Line between SKA (Chainage 19+700) and the Exit of Oinoi Railway Station (Ch. 71+400), Reconstruction of Agios Stefanos Tunnel

Safety assessment Report for the project: “Upgrade of the Existing Double-Track Railway Line between SKA (Chainage 19+700) and the Exit of Oinoi Railway Station (Ch. 71+400), Reconstruction of Agios Stefanos Tunnel (Ch. 35+500 to Ch. 35+700), and Construction of a Level Crossing at the Existing Aliartos Railway Station”. Design Phase. (Ch. 119+300) (AS 296) (AsBo INF). 

Date

11 November 2026

Tags

Projects

 

logo enTransparent

 

 

 

CONTACT

Vitali 10 Cholargos, ZIP 15562

contact@euclidis.gr

+30 210 7489728