EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:
Safety assessment Report for the project: “Upgrade of the Existing Double-Track Railway Line between SKA (Chainage 19+700) and the Exit of Oinoi Railway Station (Ch. 71+400), Reconstruction of Agios Stefanos Tunnel (Ch. 35+500 to Ch. 35+700), and Construction of a Level Crossing at the Existing Aliartos Railway Station”. Design Phase. (Ch. 119+300) (AS 296) (AsBo INF).

CONTACT
Vitali 10 Cholargos, ZIP 15562
contact@euclidis.gr
+30 210 7489728