EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:
Conformity Assessment by a Notified Body of Railway Tunnels on the Line Sections Thriasio–Ikonio, Athens–Tithorea and Domokos–Thessaloniki, in Accordance with Regulations (EU) No 1299/2014 and 1303/2014 (as in Force) (C.N 290) .

CONTACT
Vitali 10 Cholargos, ZIP 15562
contact@euclidis.gr
+30 210 7489728