EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:
Construction of the quadruple railway corridor at the section ‘exit of R.S. Athens – Treis Gefyres’ with underground construction at Sepolia area (C. No. 2507) (TSI INF 1299/2014, TSI SRT 1303/2014, TSI ENE 1301/2014).
Client : J/V INTRAKAT, SIDIRODROMIKA ERGA S.A.

CONTACT
Vitali 10 Cholargos, ZIP 15562
contact@euclidis.gr
+30 210 7489728