Projects


EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:

 

 

Construction of the infrastructure of the new double railway line, section Rododafni – Psathopyrgos including Panagopoula tunnel (C.N. 579).

Construction of the infrastructure of the new double railway line, section Rododafni – Psathopyrgos including Panagopoula tunnel (C.N. 579).

Construction of the infrastructure of the new double railway line, section Rododafni – Psathopyrgos CH. 91+500 to CH. 113+000 and Panagopoula tunnel (C. No. 579) (TSI INF 1299/2014, TSI SRT 1303/2014).

Client :  ΑΚΤOR/J&P ΑVAX/ΙΝΤRΑΚΑΤ (PANAGOPOULA JOINT VENTURE)

Date

05 June 2019

Tags

Projects

 

logo enTransparent

 

 

 

CONTACT

157 Michalakopoulou  str, 115 27 Athens

contact@euclidis.gr

+30 210 7489728