EUCLIDIS S.A. participates in the conformity assessment according to the TSIs and the issuance of Interoperability certification of the projects:
Construction of the infrastructure of the new double railway line from CH. 113+000 up to CH. 123+500, in the section Psathopyrgos – Rio area (C. No. 716) (TSI INF 1299/2014, TSI SRT 1303/2014).
Client : GD INFRASTRUTTURE SRL
CONTACT
157 Michalakopoulou str, 115 27 Athens
contact@euclidis.gr
+30 210 7489728